Skip to content
Why the Dead Sea Is Shrinking
ChunksChunks Microlearning
Why the Dead Sea Is Shrinking

Why the Dead Sea Is Shrinking

Israel's 1964 water carrier moved 320 million cubic meters a year, starting the Dead Sea's collapse.

Chapter 1

The Plan Nobody Signed

1:06

In 1955, American ambassador Eric Johnston carried a plan across the Middle East meant to divide the Jordan River basin's water fairly among Israel, Jordan, Syria and Lebanon. It would have given Israel 25 million cubic meters of Yarmouk water a year, Syria 90 million, Jordan 375 million. No Arab government would sign anything implying recognition of Israel, and the Johnston Plan died unratified. Israel did not wait. Its state water company, Mekorot, had already broken ground on the National Water Carrier project itself in 1953, giving new purpose to the decades-old Degania Dam at the lake's outlet, and by 1964 it finished the Carrier system, roughly 130 kilometers long, running from the Sea of Galilee down to the Negev desert. It moved about 320 million cubic meters of water south every year. The Jordan River had once poured roughly 1.3 billion cubic meters a year into the Dead Sea. That flow was about to be cut toward a small fraction of it.

Frequently Asked Questions

Why did the Dead Sea start shrinking in the first place?

Israel built the National Water Carrier, completed in 1964, to pump Sea of Galilee water 130 kilometers south to farms and cities. This cut the Jordan River's historic inflow of about 1.3 billion cubic meters a year toward a small fraction of that, starving the Dead Sea of its main water source.

What was the War over Water?

After Israel's water carrier began operating, Arab states approved a 1964 plan to divert the Jordan's headwaters away from Israel. Syria's construction of the diversion canal drew Israeli artillery and airstrikes between 1965 and 1966, including the shootdown of a Syrian MiG-21, and the standoff is cited among the causes of the 1967 Six-Day War.

Was anything ever done to fix the shrinking Dead Sea?

Israel, Jordan and the Palestinian Authority studied piping Red Sea water to the Dead Sea between 2008 and 2013 and signed a 2013 memorandum for a scaled-down pilot. Jordan abandoned the roughly $400 million pilot in June 2021, citing lack of Israeli interest, and no comparable project has replaced it.

Learn more

To continue the story, download the Chunks Microlearning app

AppleDownload on iOS
GoogleDownload on Android